icon
social social social social

Relocation and installation in the project position of 11 units of pressing equipment weighing from 5 to 65 tons, delivered from Kazakhstan

26.04.2022

Press releases

Client: LLC «Orlovsky Steel Rolling Plant», LLC «OSPAZ»

Region: Orel

Completion period: April 2022

Equipment used: SL300, trawl, axles.

Description of work: Relocation and installation in the project position of 11 units of press equipment weighing from 5 to 65 tons, delivered from Kazakhstan. The equipment stored on the site on the territory of LLC «OSPAZ» was moved to the transport axles with the help of the portal system SBL 300 and then to the workshop, sequentially according to the project to produce equipment installation. Inside the workshop, the equipment was also moved from the vehicle to the project position using portal hydraulic systems SBL300. The complexity of the work was the significance cramped intra-workshop territory.